Pretty much the same in Europe, the transition layer must be minimum 1000 ft so it depends on the QNH and is determined hourly or so by ATC.
Pretty much the same in Europe, the transition layer must be minimum 1000 ft so it depends on the QNH and is determined hourly or so by ATC.