Can I draw the taxiways in just to this new parking location, or do I also need to “redraw” taxiways to the stock MSFS 2020 parking locations at CVG? Thanks so much for the advice.
Can I draw the taxiways in just to this new parking location, or do I also need to “redraw” taxiways to the stock MSFS 2020 parking locations at CVG? Thanks so much for the advice.